Over the years, we've always compared our family life to a wagon train heading west. Just as everyone had to do his part to get to Oregon years ago, so everyone in our family must do his/her part to make our journey through life successful. If somebody climbs in the wagon and lets the others do the work, we just don't make any progress. We all have to pull our weight and work together. Along the trail we find lots of pebbles that make for a smooth ride and some bigger rocks that jar us a little; we hit the occasional pothole that can slow us down. But if we purpose to search diligently, there are countless gold nuggets and precious gemstones along the way as well. This journal is an attempt to preserve some of those precious moments for our children, and our children's children, as together we travel this trail called life.

Thou wilt shew me the path of life: in thy presence is fulness of joy; at thy right hand there are pleasures for evermore. Psalm 16:11


Tuesday, January 25, 2011

Remember When…

…we turned our crawlspace into a basement?

First, Dad cut a hole in the west side of the crawlspace concrete wall so we could insert a conveyor which we rented from a neighbor.

100_6384

Installing the conveyor; this was on a Saturday.

100_6394

100_6399

100_6421

And the digging began…girls helped too.

100_6432

100_6433

The boys by far did most of the digging but couldn’t be bothered to stop for pictures (hence Jesse’s look of irritation).

100_6434

Looking south from the furnace room into the crawlspace.

100_6435

Unbelievably rapid progress. According to the date on the picture, this is a week later.

100_6439

Hard to believe our basement used to look like this!

100_6440

Outside, the 4-wheeler and the mower both pulled trailers which were parked under the conveyor and then hauled to the pile. There was plenty of work for all, and the kids worked HARD. We knew we faced the danger of rain caving in the walls once we hauled the supporting dirt away, so the pace was pretty frantic, with a lot of stress on Dad. The kids kept it moving great, in addition to doing their schoolwork.

100_6442

Always time for fun, though!

100_6447

That second Saturday, Dad cut the next hole in the south crawlspace wall. We had hired a few high school boys to help with the digging, both on a Monday school holiday (Columbus Day, maybe?) and on this Saturday. They were a tremendous help.

100_6448 

If I remember right (can’t say I recognize the top of this head), Kendall Fehr helped knock out this hole.

100_6450

Done!

100_6451

Inside crew – Drake and Wade Sinn, Kendall, and Trent was there somewhere too. The conveyor kept clogging from dirt that would get thrown underneath, so this highly sophisticated cardboard and duct tape conglomeration was invented to prevent that problem.

100_6452

Removing the conveyor from the west hole…

100_6456

…inserting it into the south hole.

100_6458 

Ready to go again.

100_6460

This time the angle called for something higher, so the hayrack was employed to catch and move the dirt.

100_6465

100_6471

Then…it rained!!

crawlspace2

crawlspace3

We mounted these tarps and boards in an attempt to direct the rain away from the house, with limited success.

tarp1 

Despite the worry and stress of the issue, the walls did not turn to mud and the house did not fall in, thankfully. On Saturday, October 18, exactly two weeks after being inserted for the first time, the conveyor was removed for the last time, and we were ready for concrete.  For most of that two weeks, we were extremely blessed with pleasant weather – much rain could have been disastrous. After building the forms, we were ready to pour footings.

100_6492

100_6504

100_6508

Always we were glad for Uncle Jerry’s help. He taught us a lot.

100_6517

Blue lines are marked where the door will be knocked out – a very dusty job so no pictures of that step. This is looking north into the furnace room.

100_6528

Looking south from the furnace room.  The door has been knocked out, and forms and supports are being built for the walls.

100_6542

Ready to pour walls…

100_6547

Look closely to see the concrete chute. All the concrete came in right there and had to be shoveled both left and right to completely fill all the forms. There was tremendous pressure at that spot, and, wouldn’t you know it, one of those support beams was weakened by a knothole or something so it gave way about halfway through. This allowed the wall to bow out right there, but with lots of determination and strength, the concrete was shoveled away from that spot and the forms were reinforced, leaving very little bow in the finished wall.

100_6570

Little ones held flashlights so shovelers could see what they were doing.

100_6575

Many hands were needed.

100_6576

I learned that steel rods called rebar are mounted inside concrete for strength.

100_6587

Grandpa Steiner stopped by and got put to work too.

100_6589

100_6592

Tori was the photographer, and she did a great job; Sarah and Jewel were on stools watching, if I remember right.

100_6623

Nice ruts. I kind of forget, but I think this was the second loaded concrete truck, and the driver was kind of young. He got thoroughly stuck (the first driver knew how to drive in soft ground and had no problem).

100_6638

Praise God for wonderful neighbors! Dave Uhlman to the rescue.

100_6646

Finishing up.

100_6667

Dave got put to work too. We were so thankful for his help and his tractor.

100_6685

Done, November 19.

100_6762

Plumbing for the bathroom…Dad and the boys did it all.

100_6780

December 18, Brett and his crew, with Levi and Jesse helping, poured the floor for us.

100_6858

100_6865

100_6866

100_6868

Done.

100_6907

And this is how the basement bedroom has looked for the last 2+ years. Quite rudimentary, but our boys never minded.

P1010696

Also during the rest of the winter of 2008, Dad and the boys built walls for a bathroom and storage room. I can only surmise that with Christmas plans, being pregnant with Joshua, and then having him, I didn’t take one single picture of the construction progress on that part of the project. I do know that I singlehandedly did the sponge painting in one magnificent 45 minute stretch when Joshua was sleeping, so that must have been early spring, but other than that, the boys did it all, with Dad managing in the evenings. Every night he would go over the next step and answer any questions they had about it. They built the walls, did the drywall and mudding, did the priming, installed the mirror, lights, stool, shower, and sink/vanity, and did all the trim. We hired Tim Ropp to do the plumbing and wiring, but other than that, Dad and the boys did ‘er all. And they did a great job, too, and the boys learned a lot of valuable skills.

The west bedroom wall, which is also the east bathroom wall.

P1010854

The bathroom -

P1010851

P1010850

Looking south into the well-used storage room. Tim Ropp also raised some of the ductwork for us as it was pretty low before. The boys built me lots of heavy-duty shelves (from Menards) which have been invaluable to me; I greatly appreciate my storage room and often marvel that all this baby paraphernalia, extra toys and bedframes, canning jars, homeschool records, butchering tubs, etc. used to be accessed only by the kids crawling all over the crawlspace and me trying to tell them WHICH box it was that I needed. I’m so thankful for a better way.

P1010860

Which  brings us to the current project of finishing the bedroom, which has already been sufficiently chronicled.

Good day!

No comments: